The Operations Monitor on my Ivanti Server does not update status from scheduled to installing or done on the majority but not all of my servers. On the server being patched the dplyevts.log says "PingBack.cpp:63 Sending data to 'https://[Console alias]:3121/ST/Console/Deployment/Tracker/v92' failed: 12175."
The patches are installed OK with STDeploy.log on the target servers saying "Process exit code: 0" but I need to get the Operations Monitor to report this back.